Sunday, September 8, 2019

Ground mount almost finished

We are almost done with the ground mount for our solar panels. Just waiting to get all the rails up. The rails hold the solar panels.
 The steel is all installed. It was not too difficult to put everything together. I had a couple people helping me because the steel beams do weigh over 75 lbs each. Everything bolted up fine, the company shorted me some special nuts in the two kits but, I was able to purchase them locally.
I have to finish putting up the rails. Then the solar company will come and put the panels on the rails and wire everything up.
I have about 16 silver rails that will be mounted to the steel. Once the solar panels are bolted down to the rails, I will lift the whole structure to the top of the black pole. There are two collars and a few bolts to tighten up at that point. Then the rigging can be removed, the last two solar panels will then go on where the poles are sticking through the steel. We will then be able to adjust the tilt angle with the handle you see at the back of the black pole. The buckets you see hold the pull chain of the chain fall, so the chains don't get full of sand.